12 Episodes
Third installment of the Build Science curriculum
Building Science experts Steve Baczek and Matt Risinger dissect critical assemblies by analyzing how to maintain continuity of water, thermal, air and vapor management strategies. Join Matt Risinger and Steve Baczek as the walk-through assembly designs for foundation, above grade wall, and roof assemblies to examine where the concerns and risks exist and how to properly detail these assemblies to put each of them in a “Position to Succeed.” Dive deep into specific products and applications.
Episodes:
- Foundation Assemblies – three-piece foundation/turned down slab
- Foundation Assemblies – basement foundation/crawlspace foundation
- Foundation Assemblies – pier foundation,/insulated concrete form foundation
- Above Grade Wall Assemblies – 2×4/6.5 sheathing/2×4 6 insulated sheathing
- Above Grade Wall Assemblies – staggered Stud Wall/double stud wall
- Above Grade Wall Assemblies – perfect wallLarsen truss wall
- Roof Assemblies – vented cut roof/.vented scissor truss roof
- Roof Assemblies – unvented cut roof/unvented truss roof
- Roof Assemblies – cathedralized vented roof/vented scissor truss roof
- Roof Assemblies – over vent cut roof/.unvented Monopoly
- Roof Assemblies – flat roof cavity insulated/flat roof over insulated
- Wrap-Up
New Episodes Released Q2 2025